<?xml version="1.0" encoding="utf-8"?>
<feed xmlns="http://www.w3.org/2005/Atom">
    <id>https://docs.sitehut.app/en-US/articles/</id>
    <title>SiteHut Documentation Blog</title>
    <updated>2026-06-06T00:00:00.000Z</updated>
    <generator>https://github.com/jpmonette/feed</generator>
    <link rel="alternate" href="https://docs.sitehut.app/en-US/articles/"/>
    <subtitle>SiteHut Documentation Blog</subtitle>
    <icon>https://docs.sitehut.app/en-US/img/sitehut-icon-light.png</icon>
    <entry>
        <title type="html"><![CDATA[Final Account Disputes — What Small Builders Can Document From Day One]]></title>
        <id>https://docs.sitehut.app/en-US/articles/final-account-disputes-prevention/</id>
        <link href="https://docs.sitehut.app/en-US/articles/final-account-disputes-prevention/"/>
        <updated>2026-06-06T00:00:00.000Z</updated>
        <summary type="html"><![CDATA[Practical documentation habits that reduce final account arguments on UK building jobs—not legal advice, but lessons from decades on site.]]></summary>
        <content type="html"><![CDATA[<p>Final account disputes rarely start at final account. They start twelve weeks earlier when an instruction was given verbally, a variation was priced in a text message, and nobody wrote it down on the job record.</p>
<h2 class="anchor anchorWithStickyNavbar_LWe7" id="what-actually-gets-disputed">What actually gets disputed<a href="https://docs.sitehut.app/en-US/articles/final-account-disputes-prevention/#what-actually-gets-disputed" class="hash-link" aria-label="Direct link to What actually gets disputed" title="Direct link to What actually gets disputed" translate="no">​</a></h2>
<p>On small UK housebuilding and contracting jobs, the same themes repeat:</p>
<ul>
<li><strong>Unsigned or unclear variations</strong> — "I thought that was included."</li>
<li><strong>Instruction vs variation</strong> — client-directed change never formally priced.</li>
<li><strong>Programme impact</strong> — delay costs argued without a contemporaneous record.</li>
<li><strong>Retention and defects</strong> — snags conflated with disputed variations.</li>
</ul>
<p>None of this requires a six-figure software rollout to improve. It requires <strong>habit and a single job record</strong>.</p>
<h2 class="anchor anchorWithStickyNavbar_LWe7" id="document-from-day-one">Document from day one<a href="https://docs.sitehut.app/en-US/articles/final-account-disputes-prevention/#document-from-day-one" class="hash-link" aria-label="Direct link to Document from day one" title="Direct link to Document from day one" translate="no">​</a></h2>
<h3 class="anchor anchorWithStickyNavbar_LWe7" id="1-log-client-instructions-when-they-happen">1. Log client instructions when they happen<a href="https://docs.sitehut.app/en-US/articles/final-account-disputes-prevention/#1-log-client-instructions-when-they-happen" class="hash-link" aria-label="Direct link to 1. Log client instructions when they happen" title="Direct link to 1. Log client instructions when they happen" translate="no">​</a></h3>
<p>Whether by email, portal, or site meeting note: capture <em>what</em> changed, <em>when</em>, and <em>who</em> instructed it. Tie it to the job—not a personal inbox.</p>
<h3 class="anchor anchorWithStickyNavbar_LWe7" id="2-price-variations-before-work-proceeds-where-possible">2. Price variations before work proceeds where possible<a href="https://docs.sitehut.app/en-US/articles/final-account-disputes-prevention/#2-price-variations-before-work-proceeds-where-possible" class="hash-link" aria-label="Direct link to 2. Price variations before work proceeds where possible" title="Direct link to 2. Price variations before work proceeds where possible" translate="no">​</a></h3>
<p>Your contract terms may require this. Even when they do not, pricing early surfaces disagreement when you can still negotiate—not at handover.</p>
<h3 class="anchor anchorWithStickyNavbar_LWe7" id="3-keep-a-running-contract-forecast">3. Keep a running contract forecast<a href="https://docs.sitehut.app/en-US/articles/final-account-disputes-prevention/#3-keep-a-running-contract-forecast" class="hash-link" aria-label="Direct link to 3. Keep a running contract forecast" title="Direct link to 3. Keep a running contract forecast" translate="no">​</a></h3>
<p>Approved additions and omissions should update the live forecast. At final account, you are reconciling a number you have both been watching—not surprising each other.</p>
<h3 class="anchor anchorWithStickyNavbar_LWe7" id="4-use-photos-and-diary-entries-as-supporting-evidence">4. Use photos and diary entries as supporting evidence<a href="https://docs.sitehut.app/en-US/articles/final-account-disputes-prevention/#4-use-photos-and-diary-entries-as-supporting-evidence" class="hash-link" aria-label="Direct link to 4. Use photos and diary entries as supporting evidence" title="Direct link to 4. Use photos and diary entries as supporting evidence" translate="no">​</a></h3>
<p>Site diary entries with dated photos back up programme and scope arguments. They are not a substitute for signed approvals, but they fill gaps when memory fades.</p>
<h2 class="anchor anchorWithStickyNavbar_LWe7" id="where-software-helps-and-where-it-does-not">Where software helps (and where it does not)<a href="https://docs.sitehut.app/en-US/articles/final-account-disputes-prevention/#where-software-helps-and-where-it-does-not" class="hash-link" aria-label="Direct link to Where software helps (and where it does not)" title="Direct link to Where software helps (and where it does not)" translate="no">​</a></h2>
<p>Software cannot fix a bad contract. It <strong>can</strong> stop good jobs going bad because details lived in WhatsApp.</p>
<p>SiteHut keeps instructions, CVIs, and variations on a live register with contract forecast and optional approval workflows aligned to your quote terms. <a href="https://sitehut.app/#faq" target="_blank" rel="noopener noreferrer">See how we approach this on the homepage FAQ</a>.</p>
<p>For a deeper product walkthrough:</p>
<ul>
<li><a href="https://docs.sitehut.app/finances/variations/" target="_blank" rel="noopener noreferrer">Variations in SiteHut</a></li>
<li><a href="https://docs.sitehut.app/projects/rfis/" target="_blank" rel="noopener noreferrer">RFIs and project communication</a></li>
<li><a href="https://docs.sitehut.app/projects/snagging/" target="_blank" rel="noopener noreferrer">Snagging and handover</a></li>
</ul>
<h2 class="anchor anchorWithStickyNavbar_LWe7" id="when-spreadsheets-are-still-enough">When spreadsheets are still enough<a href="https://docs.sitehut.app/en-US/articles/final-account-disputes-prevention/#when-spreadsheets-are-still-enough" class="hash-link" aria-label="Direct link to When spreadsheets are still enough" title="Direct link to When spreadsheets are still enough" translate="no">​</a></h2>
<p>If you run one job at a time, variations are rare, and everyone is in the same van at 7am—you may not need change yet. When you add a second active job or external clients who email instead of visiting site, that is usually when the "search party" through threads starts costing real money.</p>
<hr>
<p><em>This article is general industry guidance, not legal advice. Rhodri has spent 35+ years in UK contracting and housebuilding; Andrew built SiteHut to encode those workflows in software.</em></p>]]></content>
        <author>
            <name>Rhodri</name>
            <uri>https://sitehut.app/about</uri>
        </author>
        <author>
            <name>Andrew Collison</name>
            <uri>https://www.linkedin.com/in/andrewcollison</uri>
        </author>
        <category label="Construction" term="Construction"/>
        <category label="Variations" term="Variations"/>
        <category label="Housebuilding" term="Housebuilding"/>
    </entry>
    <entry>
        <title type="html"><![CDATA[How to Run a Variation Register Without Spreadsheet Chaos]]></title>
        <id>https://docs.sitehut.app/en-US/articles/variation-register-without-spreadsheets/</id>
        <link href="https://docs.sitehut.app/en-US/articles/variation-register-without-spreadsheets/"/>
        <updated>2026-06-06T00:00:00.000Z</updated>
        <summary type="html"><![CDATA[A practical guide for small UK builders to track variations, CVIs, and contract forecast without losing context in spreadsheets and WhatsApp threads.]]></summary>
        <content type="html"><![CDATA[<p>Most small builders do not need an enterprise ERP to track variations—they need a <strong>single place</strong> where instructions, client approvals, and running contract value stay tied to the job.</p>
<h2 class="anchor anchorWithStickyNavbar_LWe7" id="why-spreadsheets-break-down">Why spreadsheets break down<a href="https://docs.sitehut.app/en-US/articles/variation-register-without-spreadsheets/#why-spreadsheets-break-down" class="hash-link" aria-label="Direct link to Why spreadsheets break down" title="Direct link to Why spreadsheets break down" translate="no">​</a></h2>
<p>Spreadsheets work until they do not. The usual failure points:</p>
<ol>
<li><strong>Version drift</strong> — two people update different copies of the same register.</li>
<li><strong>Lost context</strong> — the WhatsApp photo that "approved" a change is three screens above the message you need at final account.</li>
<li><strong>No running forecast</strong> — variations live in a tab that nobody updates until month-end.</li>
</ol>
<h2 class="anchor anchorWithStickyNavbar_LWe7" id="a-minimum-viable-variation-register">A minimum viable variation register<a href="https://docs.sitehut.app/en-US/articles/variation-register-without-spreadsheets/#a-minimum-viable-variation-register" class="hash-link" aria-label="Direct link to A minimum viable variation register" title="Direct link to A minimum viable variation register" translate="no">​</a></h2>
<p>Whether you use SiteHut or a spreadsheet today, every job benefits from the same fields:</p>
<table><thead><tr><th>Field</th><th>Why it matters</th></tr></thead><tbody><tr><td>Reference</td><td>Ties the variation to drawings, emails, or site diary entries</td></tr><tr><td>Origin</td><td>Client instruction, CVI, or builder-requested change</td></tr><tr><td>Status</td><td>Draft → submitted → approved / rejected</td></tr><tr><td>Value</td><td>Agreed addition or omission to contract sum</td></tr><tr><td>Approval evidence</td><td>Signed link, email, or portal record</td></tr></tbody></table>
<p>Rhodri has seen too many final accounts turn into arguments because step five was "someone said yes on site" with no record.</p>
<h2 class="anchor anchorWithStickyNavbar_LWe7" id="moving-off-pure-spreadsheets">Moving off pure spreadsheets<a href="https://docs.sitehut.app/en-US/articles/variation-register-without-spreadsheets/#moving-off-pure-spreadsheets" class="hash-link" aria-label="Direct link to Moving off pure spreadsheets" title="Direct link to Moving off pure spreadsheets" translate="no">​</a></h2>
<p>When you are ready for software, look for:</p>
<ul>
<li><strong>Job-scoped records</strong> — variations live on the job, not in a shared drive folder.</li>
<li><strong>Client sign-off without extra seats</strong> — secure links or a portal view for that job only.</li>
<li><strong>Live contract forecast</strong> — approved variations update the running total automatically.</li>
</ul>
<p>SiteHut handles this on the job timeline alongside programme and invoicing. If you are still comparing approaches, see our honest take on <a href="https://sitehut.app/compare/vs-spreadsheets-whatsapp" target="_blank" rel="noopener noreferrer">SiteHut vs spreadsheets and WhatsApp</a>.</p>
<h2 class="anchor anchorWithStickyNavbar_LWe7" id="learn-more-in-the-docs">Learn more in the docs<a href="https://docs.sitehut.app/en-US/articles/variation-register-without-spreadsheets/#learn-more-in-the-docs" class="hash-link" aria-label="Direct link to Learn more in the docs" title="Direct link to Learn more in the docs" translate="no">​</a></h2>
<ul>
<li><a href="https://docs.sitehut.app/finances/variations/" target="_blank" rel="noopener noreferrer">Variations guide</a></li>
<li><a href="https://docs.sitehut.app/finances/quotes/" target="_blank" rel="noopener noreferrer">Quotes and contracts</a></li>
<li><a href="https://docs.sitehut.app/getting-started/" target="_blank" rel="noopener noreferrer">Getting started</a></li>
</ul>
<hr>
<p><em>Andrew builds SiteHut; Rhodri brings 35+ years of UK construction commercial experience to how we design variation workflows.</em></p>]]></content>
        <author>
            <name>Andrew Collison</name>
            <uri>https://www.linkedin.com/in/andrewcollison</uri>
        </author>
        <author>
            <name>Rhodri</name>
            <uri>https://sitehut.app/about</uri>
        </author>
        <category label="Construction" term="Construction"/>
        <category label="Variations" term="Variations"/>
        <category label="Housebuilding" term="Housebuilding"/>
    </entry>
    <entry>
        <title type="html"><![CDATA[Why We Built SiteHut for Modern Housebuilders]]></title>
        <id>https://docs.sitehut.app/en-US/articles/why-we-built-sitehut/</id>
        <link href="https://docs.sitehut.app/en-US/articles/why-we-built-sitehut/"/>
        <updated>2026-03-14T00:00:00.000Z</updated>
        <summary type="html"><![CDATA[A deep dive into the broken processes of housebuilding and how SiteHut fixes them.]]></summary>
        <content type="html"><![CDATA[<p>Housebuilding is incredibly complex, but the software running it shouldn't be. Today, we're excited to talk about why we built SiteHut.</p>
<h2 class="anchor anchorWithStickyNavbar_LWe7" id="the-core-problem">The Core Problem<a href="https://docs.sitehut.app/en-US/articles/why-we-built-sitehut/#the-core-problem" class="hash-link" aria-label="Direct link to The Core Problem" title="Direct link to The Core Problem" translate="no">​</a></h2>
<p>Most builders are stuck using spreadsheets that break, or legacy software that takes six months to learn. We realized there was a massive gap for something fast, modern, and built specifically for the workflows of housebuilders.</p>
<h3 class="anchor anchorWithStickyNavbar_LWe7" id="whats-next">What's Next?<a href="https://docs.sitehut.app/en-US/articles/why-we-built-sitehut/#whats-next" class="hash-link" aria-label="Direct link to What's Next?" title="Direct link to What's Next?" translate="no">​</a></h3>
<p>We'll be posting weekly updates here on our engineering progress, new features, and tips for managing your trades and projects more effectively. Stay tuned!</p>]]></content>
        <author>
            <name>Andrew Collison</name>
            <uri>https://www.linkedin.com/in/andrewcollison</uri>
        </author>
        <category label="Product updates" term="Product updates"/>
        <category label="Housebuilding" term="Housebuilding"/>
    </entry>
</feed>